RIDGEFORM04:58 · Level 9

Ridgeform Builders · Concrete and structures since 2009

The structure everything stands on.

We build concrete frames, foundations and floors for developers, owners and design-build teams. Scroll through one pour day on level 9, from the first floodlight to the last trowel, and see how we work.

38projects delivered
214slabs poured
7-dayfloor cycle
0lost-time injuries this year
04:58Lights on · Level 9

We start before the city does.

Our crew is on deck before sunrise, so the pump arrives to a slab that's ready, not a crew that's waiting. Early starts are how we hold a 7-day floor cycle.

04:58Cam 01 · Deck access
11,400
05:40Cam 02 · Grid C4
05:40Rebar

11,400 ties. Every one checked.

Reinforcement goes in exactly to the engineer's drawings and is inspected before a single truck is called. What's in your slab is what's on the drawing.

Bar sizes
#4–#8
Cover
40 mm
Inspection
Pre-pour
06:30Gate 2

The first truck, on the minute.

We book the batch plant, pumps and traffic control ourselves, so trucks arrive in sequence and the pour never stops.

06:30Cam 03 · Gate 2

We book the batch plant, pumps and traffic control ourselves, so trucks arrive in sequence and the pour never stops for a late load.

Trucks
18
Interval
12 min
142 m³
07:15Cam 04 · Bay C
07:15The pour

142 m³. One continuous pour.

No cold joints. Our pump crew places and vibrates the concrete as one monolithic slab, the way your structure was designed to work.

Strength
40 MPa
Pour time
4 h 10
Pump reach
42 m
09:00Screed

Level to within 3 mm.

Screeded to laser levels while the concrete is still workable, so your floor finishes, partitions and coverings go straight down without packing or grinding.

0.0
Deviation+12.0mm from datum
09:00Drone · Overhead
17:20
17:20Finish

Mirror-flat by sunset.

Power-trowelled as soon as the slab can take it, for a hard, dense, dust-free surface that's ready for polishing or direct finishes.

17:20Cam 06 · Bay C
18:05Level 9 done

Floor 9 of 24. Back tomorrow.

18:05Drone · Wrap

Every slab, every day, until the roof. That's what you're hiring.

Get a quote

Let's pour your next floor.

Send us the basics. An estimator replies within one working day with a budget range and the questions we need answered to firm it up.

  • 01

    Foundations and basements

    Piles, rafts and retaining walls, dug and poured by our own crews.

  • 02

    Concrete frames

    Columns, cores and slabs up to 30 storeys on a 7-day cycle.

  • 03

    Post-tensioned slabs

    Longer spans and thinner floors, stressed and certified on site.

  • 04

    Industrial and polished floors

    Warehouses, showrooms and lobbies, laser-screeded and trowelled.

Start
Estimating
+1 (512) 555-0148
Yard
1400 E 4th St, Austin, TX